In Reply to: When are we gonna get a posting from a Z8 OWNER? posted by Z8 Bob on March 23, 2000 at 16:49:30:
the first ones were supposed to be shipped late april early may (i have heard that might be delayed). As of 2 weeks ago there were 82 Z8s in BMW DCS 2000 computer system. Some were in the status waiting for production slots, some had started in production (production meaning body assembly and painting NOT final assembly which can be 2-3 weeks after body assembly starts).